Timber Frame Drying Auckland (Pre-Line ≤18% MC)

Auckland Timber-Frame Moisture Clearance

Need it dry fast? We size, deliver, and place the right dehumidifiers and high-flow fans, then monitor until you’re under target. Council-ready logs included.

[Book a Free Pre-Line Moisture Inspection]

Construction Drying Pack — $400 + GST (3-7 days)

Ideal for 150 m2 Terrace House
Large 90 L Dehumidifier + 2 high-flow fans + Free Moisture Meter
Security Chains Padlock + safety power board 

Call Now: 021-877-504

Council-Ready Moisture Log (Example)

Date | Room/Stud | MC% | Notes
Day 1 | Lounge bottom plate | 28% | Setup, cross-flow
Day 2 | Lounge bottom plate | 22% | Stable VPD
Day 3 | Lounge bottom plate | 17% | Meets pre-line target

🔥 Heavy Duty Construction Drying Pack

Diesel Fan Heater + Large 90 L dehumidifier + Moisture Test

$140 + GST per day, 7-day: $500 + GST

📞 Call Now: 021-877-504

Packages by build size

Starter (≈20–60 m²)
1 dehumidifier • 2–3 air movers — bathrooms & small additions

Builder (≈60–140 m²)
2 dehumidifiers • 4–6 air movers — single-level homes

Pro (≈140–250 m²)
3–4 dehumidifiers • 8–12 air movers — new builds / multi-room renos

Multiplex (250 m² +)
Scaled kit with containment and monitoring for controlled environments

Containment, heaters, and dataloggers can be added for winter or stubborn moisture.


HOW LONG IT TAKES

  • Light wetting after rain wrap-up: 2–4 days

  • Fresh framing ~25–35% MC: 3–5 days

  • Heavy wetting / cold sites: 5–8 days
    We monitor daily and remove gear as soon as you’re under target.

Not sure the frame is ready to line? Read My Pre-Line Checklist.

Calibrated pin-meter proof ≤ 15 % MC (NZBC E2 / NZS 3602)

Plan • Place • Prove (our on-site routine)

  1. Plan — quick sizing call; share m², photos, and access.

  2. Place — we position dehus and fans to build stable, dry airflow paths.

  3. Prove — scheduled checks with dated readings and a final moisture log for your PM or council.

Targets: pre-line is generally ≤18% MC; some specs call for ≤15% MC with a calibrated pin-meter. We document whichever applies.

Case Studies (Auckland Sites)

Manurewa — 5  X 150 m² Terrace House Units

Start: 31% → Finish: 17% in aruond 4 days per unit
Setup: 1 dehumidifier + 2 fans
Process: Doors/windows sealed; daily meter photo and log; airflow aimed along studs and into corners.
Moisture log :

  • Day 1: 31% → 26%

  • Day 2: 23%

  • Day 3: 19%

  • Day 4: 17% (pass)


Takapuna — 200 m² House

Start: 29% → Finish: 16% in 3 days
Setup: 1 dehumidifier + 2 fans + gentle heater
Moisture log (sample):

  • Day 1: 29% → 24%

  • Day 2: 20%

  • Day 3: 16% (pass)


Karaka— 400 m² Lifestyle Property

Start: 33% → Finish: 17% in 5 days
Setup: 2 dehumidifiers + 3 fans
Moisture log (sample):

  • Day 1: 33% → 28%

  • Day 2: 24%

  • Day 3: 21%

  • Day 4: 19%

  • Day 5: 17% (pass)

Auckland Council pre-line guidance

Two Ways to Work With Us

DIY Hire (budget-friendly for 20–35% MC): we deliver a commercial dehumidifier + fans; you run it with our phone support.
Full-Service Contracting: we handle setup, daily checks, logging, and removal—aimed at passing pre-line with minimal site disruption.

What you get on every job

  • Moisture proof for council: digital log with site, date, and pin-meter readings.

  • Right kit for your footprint: dehumidifiers + high-velocity air movers matched to m², humidity, and weather.

  • Hassle-free logistics: delivery, placement, and airflow paths set for even, efficient drying.

Service Areas

Auckland CBD • North Shore • West Auckland • East Auckland • South Auckland • Hibiscus Coast

FAQs

What moisture % do I need to pass pre-line?
Most inspectors look for framing under ~18% MC (species/site can vary). We measure and log to that target.

How long will it take?
Commonly 3–5 days with correct airflow/heat; we size gear on inspection..

My VPD & Airflow guide

Do I need heaters as well as dehumidifiers?
In cold weather or shaded sites, a little heat speeds drying dramatically. We’ll advise if it’s worth it.

Can you prove it’s dry?
Yes—calibrated meter readings each day with a signed log for your inspector.

Assurance & Safety

We keep working until you’re under target. Routine humidity/MC records while gear is on site. Safety gear on every job (fire extinguisher, heavy-duty leads). Public liability insurance details available on request.

Ready to keep your build moving?

Get a same-day plan sized to your project.

Call 021-877-504